Connecting The Base Station To The Power Supply - Otto Bock Bionic Pro Instructions For Use Manual

Table of Contents

Advertisement

Preparing the product for use

4.4 Connecting the base station to the power supply

10
The base station is switched on when it is connected to the power supply.
► Use the plug 
(type C) for outlets of types F, E, K, L and J.
► Use the plug 
(type A (NEMA-1)) for outlets of type A (NEMA-1) and type B (NEMA-5).
► For other types of outlets, use an adapter from a specialist shop which is suitable for the connected loads of
the power supply (100–240 V/50–60 Hz).
► Connect the base station to the power supply.
→ The base station is ready after a few minutes (approx. 5 min) when the three status LEDs on the front are
illuminated continuously.
14
743A250 Bionic Pro

Advertisement

Table of Contents
loading

This manual is also suitable for:

743a250743a250 bionic pro

Table of Contents