CONVEYOR LUBRICATION
All models equipped with an unloading conveyor will require greasing at the shaft bearings. These bearings will require 1
pump every 16 hours or 50 loads. Grease fitting locations are shown in the diagrams that follow:
Magnet Chute Assembly (If equipped)
®
•
On machines equipped with the discharge magnet chute assembly, the magnet should be periodically cleaned off to
remove all of the metal debris accumulated through machine operation.
•
®
OPERATION
REPLACEMENT PARTS
®
•
Page # 66
READ complete manual CAREFULLY
BEFORE attempting operation.