Testing Operation - CYBEX 625C Owner's Manual

Table of Contents

Advertisement

2.
Press
or
Option
ATSC choices
DVB-T choices
3.
Press the SETUP
Exit Set Up Mode by pressing the SETUP
Setup Complete

Testing operation

Use the following instructions to test the full resistance range of the unit:
1. Plug the optional power cord into a power outlet from a grounded circuit, See Electrical
Requirements.
Coil up the remainder of the power cord and place it out of the way. If you do not have the optional
power supply, skip to step 3.
2. Verify the control panel will illuminate and is in Dormant Mode.
3. Hold the handrails to steady self while stepping into the pedals.
4. Begin pedaling.
5. Press the Quick Start key.
6. Run unit through full resistance range.
First press the RESISTANCE + key until unit reaches its highest load (the display will show "21").
Then press the RESISTANCE - key until unit reaches its lowest load (the display will show "1"). The
resistance should increase and decrease while pedaling.
When unit reaches the set resistance, the displays will stop flashing and remain steadily illuminated
to indicate the desired setting has been reached.
7. Wait until pedals come to a complete stop before dismounting the unit.
Hold the handrails to steady self while stepping off the unit.
Cybex 625C/625R Cycle Part Number LT-23688-4 F
to select language.
Description
English, Français or Español.
English, Français, Español, Dutch, Danish, Russian, German, and Swedish.
button to return to SETUP MODE menu.
button.
Page 45 of 80

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

625r

Table of Contents