Step 3: Install The Server In The Rack - Oracle Server X5-4 Getting Started Manual

Hide thumbs Also See for Server X5-4:
Table of Contents

Advertisement

2. Before installing the server in the rack, install any optional components (such as DIMMs or PCIe cards).
For component installation procedures, refer to the Oracle Server X5-4 Service Manual.
Optional components might be packaged and shipped separately from the server.
Note -

Step 3: Install the Server in the Rack

Bodily injury and equipment damage. The server is heavy. Do not attempt to lift the server without
Caution -
the assistance of a mechanical device.
For rackmounting instructions, refer to the documents included with the rail kit, the service label attached to the
server, or the Oracle Server X5-4 Installation Guide.
Step 4: Connect Cables and Devices to the Server
Connect cables and devices to the server, so you can power on the server, connect it to your network, and access
Oracle System Assistant. Oracle System Assistant helps you set up the server and install an operating system (OS).
2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Server X5-4 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents