Omron LD-60 User Manual page 143

Hide thumbs Also See for LD-60:
Table of Contents

Advertisement

5. Pass the connectors up through the oval slot in the payload bay [(A) in Figure 9-17].
6. Connect the front sensor's DB9 plug to port RS-232-1 on the upper front of the LD-250
Core [(B) in Figure 9-17].
7. Connect the Molex Mini-fit plug power to the user power connector on the back side of
the LD-250 Core [(D) in Figure 9-17].
8. (Dual Only) Use a 4 mm hex key and the two supplied M5 socket head cap screws and
washers to install the sensor marked Rear at location [(B in Figure 9-13].
Make sure that the sensor is facing forward, toward the front of the LD-250.
9. (Dual Only) Route the sensor cable as shown in Figure 9-18.
13732-000 Rev J
Figure 9-16 LD-250 Front HAPS Cable Routing Through the Chassis
Figure 9-17 LD-250 Front HAPS Cable Routing Into the Payload Bay
LD Platform Peripherals Guide
Chapter 9: High Accuracy Positioning System
143

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ld-90

Table of Contents