Omron LD-60 User Manual page 135

Hide thumbs Also See for LD-60:
Table of Contents

Advertisement

cable.
5. Cable-tie the wires from the front sensor to the anchors.
6. Proceed to Single and Dual-Sensor Installation, Part 2 on page 136.
Dual Sensor Installation
1. Remove four M5 stainless socket-head cap screws, split lock washers, and flat washers
from the underside of the platform. See the following figure.
Save the screws and washers for installation of the sensors.
2. Attach the front bracket assembly to the underside of the AMR, with the cable between
the bracket and the platform. Its cable will be labeled FRONT.
The cable will have two branches, each attached to a sensor and bracket assembly.
Use the screws and washers previously removed. Install the M5 screws with Loctite
243.
The sensor will already be attached to the bracket.
3. Attach the rear bracket assembly to the underside of the AMR.
Use the M5 socket-head cap screws and washers previously removed. Install the M5
screws with Loctite 243.
The sensor will already be attached to the bracket.
a. Install two cable-tie anchors to the underside of the platform, between the two
bracket assemblies. See the following figure.
13732-000 Rev J
Chapter 9: High Accuracy Positioning System
Figure 9-5 Screws to Remove, Circled
LD Platform Peripherals Guide
135

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ld-90

Table of Contents