7 Initially Starting, Configuring, and Checking System
Operation

7.1 Important Safety Instructions

CAUTION! Performing various steps in the following procedures may cause a service interruption and/or result in the
extension of alarms. Notify any appropriate personnel before starting these procedures. Also, notify personnel when these
procedures are completed.

7.2 Initial Startup Preparation

Ensure that all blocks (except the last one) in the "Installation Acceptance Checklist" on 1 have been checked.
Ensure that rectifier module mounting positions are filled by a rectifier module, as required. It is acceptable for positions to
be left vacant. A blank cover panel is available for unpopulated positions. Refer to SAG582127000.
Refer to the separate NCU Controller User Manual (UM1M830BNA) supplied with your power system for complete controller
operating information.
Refer to the configuration drawing (C-drawing) supplied with your power system documentation for factory settings of
adjustable parameters.

7.3 Initially Starting the System

NOTE!
After power is initially applied to the system it takes several seconds for the rectifier modules to begin producing
power and the control module initialization routine takes several minutes.
Procedure
1.
Apply battery power to the system by closing the external battery disconnect(s) or protective device(s) that supplies battery
power to the system, if furnished.
2.
Apply rectifier AC input power to the system by closing ALL external AC disconnects or protective devices that supply
rectifier AC power to the module mounting assemblies. Rectifiers automatically start.
3.
Open the distribution cabinet's front door.
4.
Place each distribution circuit breaker (if furnished) to the ON position.

7.4 NCU Controller Initialization

Refer to the separate NCU Controller User Manual (UM1M830BNA) for detailed instructions.
Refer to Figure 7.1 for locations of the NCU local indicators and navigation keys.