Clearance Requirements:
-
Recommended minimum clearance for the front of the system is 2' 6".
-
Recommended minimum clearance for the rear of the system is 2' 0".

3.2 Mounting the System in an Equipment Rack

This power system is designed to mount in a 23-inch wide rack having 1-inch or 1-3/4-inch multiple drillings. Refer to System
Application Guide SAG582127000 for overall dimensions. Perform the following steps to mount the power system.
DANGER! The power system is heavy. Use a hoist, battery lift, or other appropriate lifting device to raise and support the
power system during the installation. Take appropriate precautions to avoid injury.
NOTE!
Refer to "General Requirements" on page 2 for mounting restrictions and ventilation requirements.
NOTE!
The power system consists of a distribution cabinet and module mounting assemblies. The distribution cabinet is
factory connected to the module mounting assemblies. The distribution cabinet with module mounting assemblies is
mounted as a complete assembly.
Procedure
1.
Position the power system in the equipment rack.
NOTE!
In the next steps, install (orient) the ground washers so the teeth dig into the mounting angles for a secure ground
connection.
NOTE!
Compliance with Telcordia GR-1089-CORE requires that prior to mounting the system to the equipment rack:
-
All paint must be removed from the front surface of each equipment rack rail where it mates with a shelf-mounting
bracket, so that good metal-to-metal contact can be established between the shelf and rack.
-
The shelf-to-rack mating surfaces must be cleaned.
-
Electrical anti-oxidizing compound must be applied to the shelf-to-rack mating surfaces.
2.
Secure the power system to the equipment rack using hardware as shown in Figure 3.1. Use grounding washers at all
locations. Torque connections to the value indicated in Figure 3.1.
Figure 3.1: Mounting the Power System in an Equipment Rack
Front
Vertiv™ NetSure™ 7100 -48 VDC Power System Installation Manual
MOUNTING HARDWARE
12-24 x 3/4" Thread Forming Hex
Head Screw
No. 10/12 Ground Washer
Torque: 65 in-lbs.
3