This document (IM582127000900) provides Installation Instructions for Vertiv™ NetSure™ 7100 -48 VDC Power System, Spec. No.
582127000; Lists 600, 601, 900, and 901 only.
The complete Customer Documentation Package for Lists 600, 601, 900, and 901 consists of...
-48 VDC Power System Installation Manual
Power System Installation Instructions: IM582127000900
-48 VDC Power System User Manual
Power System User Instructions: UM582127000900
NCU Controller User Manual
NCU Controller User Instructions: UM1M830BNA
USB Drive with All Customer Documentation
Applicable documents for this system are as follows.
Power System Installation Instructions: IM582127000900 (instructions for Lists 600, 601, 900, and 901)
Power System User Instructions: UM582127000900 (instructions for Lists 600, 601, 900, and 901)
NCU Controller User Instructions: UM1M830BNA
Rectifier Instructions: UM1R483500e3
Power System "System Application Guide": SAG582127000
Engineering Drawings
Also, provided on the USB drive is a controller configuration drawing and the controller configuration files loaded into the
controller as shipped.

2 Installation Acceptance Checklist

Provided in this section is an Installation Acceptance Checklist. This checklist helps ensure proper installation and initial operation of
the system. As the procedures presented in this document are completed, check the appropriate box on this list. If the procedure is
not required to be performed for your installation site, also check the box in this list to indicate that the procedure was read. When
installation is done, ensure that each block in this list has been checked. Some of these procedures may have been factory performed
for you.
NOTE!
The system is not powered up until the end of this checklist.
NOTE!
Some of these procedures may have been performed at the factory for you.
Installing the System
System Secured to the Equipment Rack
Optional Lug Adapter Busbar Kits Installed (if required)
Circuit Breakers Installed (if required)