Sign In
Upload
Manuals
Brands
Vertiv Manuals
Power Supply
582127000600-901
Vertiv 582127000600-901 Manuals
Manuals and User Guides for Vertiv 582127000600-901. We have
1
Vertiv 582127000600-901 manual available for free PDF download: Installation Manual
Vertiv 582127000600-901 Installation Manual (52 pages)
-48 VDC Power System
Brand:
Vertiv
| Category:
Power Supply
| Size: 9 MB
Table of Contents
Table of Contents
3
Admonishments Used in this Document
4
Important Safety Instructions
5
Static Warning
8
Customer Documentation Package
9
Installation Acceptance Checklist
9
Installing the System
10
General Requirements
10
Mounting the System in an Equipment Rack
11
Installing Optional Lug Adapter Busbar Kits
12
Installing Optional EIB (Controller Extended Interface Board)
13
Installing Circuit Breakers and Fuses
15
Setting Jumper and Switch Options
18
Location of Circuit Cards with Jumper and Switch Options
18
Jumper Settings on the System Interface Circuit Card
19
Switch Settings on the IB2 (Controller Interface Board)
20
Switch Settings on Optional EIB (Controller Extended Interface Board)
21
Making Electrical Connections
22
Important Safety Instructions
22
Wiring Considerations
22
Power System Frame Grounding Connection
23
Central Office Ground Connection
23
AC Input and Equipment Grounding Connections (Nominal 208 VAC, 240 VAC, 277 VAC, Single Phase)
23
External Alarm, Reference, Monitoring, and Control Connections
26
Location of Circuit Cards with External Alarm, Reference, Monitoring, and Control Connectors
26
System Interface Circuit Card Connections (if Required)
27
IB2 (Controller Interface Board) Connections (if Required)
29
Optional EIB (Controller Extended Interface Board) Connections (if Required)
34
NCU Controller Ethernet Connection (if Required)
39
Load Connections
41
Load Connections to Distribution Panels and Load Return Busbars
41
Load Connections to an Optional Bullet Nose 6-Position GMT Distribution Fuse Block, P/N 549017
42
Battery Connections
43
Installing Rectifier Modules
44
Initially Starting, Configuring, and Checking System Operation
45
Important Safety Instructions
45
Initial Startup Preparation
45
Initially Starting the System
45
NCU Controller Initialization
45
Verifying and Setting the NCU Controller as Required for Your Application
47
Checking System Status
50
Final Steps
50
Advertisement
Advertisement
Related Products
Vertiv 582127000600
Vertiv 582127000601
Vertiv 582127000900
Vertiv 582127000901
Vertiv 582127000
Vertiv 582127000100
Vertiv 582127000102
Vertiv 582127000203
Vertiv 582127000500
Vertiv 582127000501
Vertiv Categories
UPS
Power Supply
Switch
Power distribution unit
Air Conditioner
More Vertiv Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL