5 Installation Acceptance Checklist
Provided in this section is an Installation Acceptance Checklist. This checklist helps ensure proper installation and initial operation of
the system. As the procedures presented in this document are completed, check the appropriate box on this list. If the procedure is
not required to be performed for your installation site, also check the box in this list to indicate that the procedure was read. When
installation is done, ensure that each block in this list has been checked. Some of these procedures may have been factory performed
for you.
NOTE!
The system is not powered up until the end of this checklist.
NOTE!
Some of these procedures may have been performed at the factory for you.
Installing the System
System Secured to Relay Rack or Cabinet Equipment Rack
Making Electrical Connections
Relay Rack / Cabinet Frame Grounding Connection Made
Frame Grounding Connection Made
NCU Controller Ethernet Port Connection Made
Rectifier AC Input and AC Input Equipment Grounding Connections Made
DC Output Connections Made
Installing Rectifier Modules
Rectifier Modules Installed
Initially Starting the System
System Started, Configured, and Checked
6 Installing the System
6.1 General Requirements
Refer to "Mounting" under "Environmental" starting on page 2.
6.2 Securing the System to a Relay Rack or a Cabinet Equipment Rack (if
required)
DANGER! If the system is mounted in a relay rack, the relay rack must be securely anchored to the floor before the system is
installed.
NOTE!
Refer to "Mounting" under "Environmental" starting on page 2 for mounting restrictions and ventilation requirements.
This power system is designed to mount in a standard 19" relay rack or equipment rack having 1" or 1 3/4" multiple drillings. 23"
mounting bracket adapter plates are available. Refer to Figure 3.1 on page 4 for overall dimensions.