PRONAR T400 Operator's Manual page 113

Table of Contents

Advertisement

CHAPTER 5
INSPECTION
INTERVAL
Figure 5.11
Mechanical suspension maintenance
(1) spring, (2) „U" bolt, (A) U bolt nuts, (B) suspension screw connections, (C) reaction rods
fastening, (D) spring clamps
In the event of severe conditions of use or heavy use, maintenance should be carried out
more often.
Servicing the hydraulic suspension system includes checking for leaks and regularly
tightening all screw connections. In the event of an oil leak on hydraulic hose connections,
tighten the connector, if this does not remove the fault - replace the hose or connector parts
If there is clearance between the springs and the axle, check the entire
mounting system: U-bolts, and guide plates and clamping plates of the
spring bolts.
5.27
SERVICE ACTIVITIES
Pronar T400

Advertisement

Table of Contents
loading

Table of Contents