1-9-7. Assembling the Cables
(1) Apply the grease to the portions of the 40058384 and 40058385 cables, which are to be
stored into the plastic rail.
(2) Place the 40058384 cables on the cables routed from the X-axis so that its CN166 side is
located inside (Figure 1-9-7-1). Equate the lengths of the swing part relay connectors for
40058385 and 40058384 (Figure 1-9-7-2).
Y veyor-cable
(3) Pull out the cables to the front side and align the connectors for 40058384 with the
connector bracket relay connectors (CN161/CN151/CN127/CN165/CN152/CN201/CN202/
CN245/CN246/CN479 sides) for 40058385.
Maintenance Guide
XY cableveyor
Figure 1-9-7-1
Figure 1-9-7-2
Plastic rail Y
1-45