Storing A Calibration Point Of G6111 Pah Module; Figure 6-8: G6111 Pah Sensor, Pah Measuring Chamber & Pah Calibration Chamber - Maritime G6100 Operation Manual

Water monitoring system
Table of Contents

Advertisement

Water Monitoring System
3. Take the syringe and attach the needle. Break the neck of the ampoule – fill the syringe
with the entire content.
4. Slowly inject the content into the PAH calibration chamber, taking care that no air is
mixed into the calibration liquid. Look into the chamber to check and remove air
bubbles.
5. Insert the PAH chamber bushing into the PAH calibration chamber.
6. Place the PAH sensor in the PAH calibration chamber in an upright position. Press the
corresponding "Calibrate" button when the highest stable raw count appears. A
calibration point has now been stored.
7. Remove and clean the PAH chamber bushing.
8. Empty out the "calibration" liquid from the calibration chamber and wipe it dry with a
new cleaning pad. Clean the PAH sensor.
9. Repeat steps 3 to 9 until all relevant "calibration" liquids according to Table 6-3 have
been in use.
10. have been used.
11. Place the PAH chamber bushing in the PAH measuring chamber again. Please refer to
Figure 6-7.
6.4.2

Storing a Calibration Point of G6111 PAH Module

Figure 6-8: G6111 PAH Sensor, PAH measuring Chamber & PAH calibration Chamber
Ver.5.0 – Revision March 2022
Page 47 of 110

Advertisement

Table of Contents
loading

Table of Contents