Commissioning

5 Commissioning
Before starting the water monitoring system for the first time after
completing the installation, please check and confirm that all connections
are installed according to the installation instruction.
After completing the installation, a verification of the installation & setup is required. Refer
to the section that represents the system to be verified.
5.1 WM
Check points relevant for the installation of the WM system are described in this section.
• Verify the check list found in the section 7. Appendix in the installation manual has
been filled out.
• Inlet and outlet hoses are connected as specified with reference to the installation
layout.
• The flow paths to and from the system are not blocked.
• The power supply connection is as specified in the Electrical Drawings.
• Protective earth is connected.
• The communication connection is as specified in the Electrical Drawings.
• Verify that the pH Electrode is correctly installed and check that the rotary switch
at the pH/temperature is set to "M".
• Valve 1-4 is set to Run.
• Power up the system by switching on the automatic fuse. Observe the start-up of
the water monitor and the sensor modules.
• Set IP-address following section 4.2.5.
• Verify that all functions described in the communication protocol found in the
installation manual are working.