Maritime G6100 Operation Manual page 108

Water monitoring system
Table of Contents

Advertisement

Appendix
B. Assembly of the new Pump
7. Lift the new pump & ensure below
fitting
connect
connection approx. 4 mm from
hose end to bottom of the fitting -
Illustration 6 & 7.
8. Install 1 bolt in the pump, wait to
fasten it until step 11 is done -
illustration 6.
9. Adapt the PTFE tube 12/10 mm
before
mounting.
recommended that PTFE tube
must be min 4 mm deep in the
fitting - illustration 7.
10. Mount the below Fitting Union.
Attention: It is important to hold
the tube and fitting straight - no
twisting, while fasten fitting -
illustration 8.
Mount the Fitting Union (T piece)
- Illustration 9.
11. Screw 1 left bolt & 1 right bolt in
the Strainer - illustration 9.
12. Install other 3 bolts in the pump &
fasten them all.
13. Connect Pump wires - according
to wiring diagram - illustration 10.
The replacement of the Pump Type
B version 2 is done.
14. For instruction of pump starts up,
refer to section 5.4, 8.1.3 & 9.4 in
this manual.
Notes:
in
T-piece
Illustration 6
It
is
Illustration 8
Illustration 10
Illustration 7
Illustration 9
Page 108 of 110

Advertisement

Table of Contents
loading

Related Products for Maritime G6100

Table of Contents