Routine Maintenance; Required Test Equipment; Required Tests - Care Fusion Alaris Technical & Service Manual

Gateway workstation
Table of Contents

Advertisement

2 Routine Maintenance

Required Test Equipment

The following test equipment is required to perform the tests in this chapter .
• Medical grade electrical safety tester, equivalent to Metron QA-90
• PC with Ethernet LAN connection, COM port and Internet Explorer 6 .0 or above installed
• Cat5e Ethernet cable
• Cat5e Ethernet Crossover cable
• Alaris® Infusion Pump with IrDA enabled which has been serviced within the past 12 months .
• IEC AC Mains Lead, 5A, straight (P/N 134748)

Required Tests

The following tests are required to test the different Workstation configurations .
Functional test
Electrical Safety Test
Power-up check
Beacon (when fitted)
Pump Loading/Removal Test
Battery Test
Setting the Time and Date
Auxiliary Workstation
(Option 1)
1000SM00015 Issue 8
Workstation Configuration
Workstation
Workstation with Wireless LAN
(Option 2)
(Option 3)
8/72
Alaris® Gateway Workstation
Routine Maintenance

Advertisement

Table of Contents
loading

Table of Contents