Upper Comms Pod - Care Fusion Alaris Technical & Service Manual

Gateway workstation
Table of Contents

Advertisement

Upper Comms Pod

Replacement Procedure
1 . Remove the eight Screws
2 . Open the Cover Assembly by hinging along one long face . Avoid stressing the connected cables and lay the Cover along side the
assembly .
3 . Disconnect the Barcode Cable Assembly
4 . Remove the labels from the Comms Pod Cover
Remove the Pod Cover and Pod Seal
5 . Remove the Plate Connector
6 . Remove the Barcode Cable Assembly Nut using an 11mm spanner .
7 . Remove the Barcode Cable Assembly .
8 . Reassemble in reverse order .
Refitting Note:
• Ensure the Barcode Cable Assembly is in the correct orientation .
• Ensure that the Ferrite is properly secured and does not move .
• Torque screws to 45 cNm .
J
Pod Seal
G
Pod Cover
I
F
(x4)
E
(x4)
D
Barcode Cable Assembly
H
Plate Connector
Barcode Cable Assembly
correct orientation
Item
Description
a
M3x16 Pan HD Torx A2 ISO 14583
b
Washer M3 Wavey SST
c
Cover Rear Asena Gateway
d
Barcode Cable Assembly
e
M3x8 Pan HD Torx A2 ISO14586
f
Washer M3 Wavy SST
g
Pod Comms Asena Gateway
h
Plate Connector Barcode
i
Fair-Rite 0431173951
j
Seal Comms Pod Asena Gateway
A
B
and Washers
securing the Rear Cover
D
from the Services Board (J15) .
G
. Remove the four Screws
J
.
H
I
, unclip the Ferrite
B
(x8)
C
A
(x8)
Ferrite
1000SM00015 Issue 8
C
to the Power Base Module .
E
and four Washers
and remove .
Rear Cover
Alaris® Gateway Workstation
Corrective Maintenance
F
securing the Comms Pod Cover .
Part Number
1000SP01217
1000ME00595
1000EL00679
1000SP01217
1000SP01214
1000ME01642
0000EL00940
1000SP01214
29/72

Advertisement

Table of Contents
loading

Table of Contents