Battery Pack - Care Fusion Alaris Technical & Service Manual

Gateway workstation
Table of Contents

Advertisement

Battery Pack

Replacement Procedure
1 . Remove the eight Screws
2 . Open the Cover Assembly by hinging along one long face . Avoid stressing the connected cables and lay the Cover along side the
assembly .
C
3 . Disconnect the Battery
4 . Reassemble in reverse order .
Refitting Note:
Ensure cable assemblies are not trapped and the Back Cover Seal is fitted to the Saddle Lug before fitting the Back Cover . Torque Screws
to 45 cNm .
Rear Cover Assembly
B
Washer (x8)
A
Screw (x8)
Item
Description
a
M3x16 Pan HD Torx A2 ISO 14583
b
Washer M2 Wavey SST
c
Gateway Assembly Battery Pack
The battery pack used in this Alaris® Gateway Workstation is manufactured by CareFusion and includes a proprietary
A
PCB (printed circuit board) designed specifically for the Alaris® Gateway Workstation, and in conjunction with
Alaris® Gateway Workstation software, controls battery use, charge and temperature . Any use of battery packs
that are not manufactured by CareFusion in the Alaris® Gateway Workstation is at your sole risk, and CareFusion
does not provide any warranty for or endorsement on any battery packs that are not manufactured by CareFusion .
CareFusion's product warranty shall not apply in the event the Alaris® Gateway Workstation has suffered damage or
premature wear, or malfunctions or otherwise operates incorrectly, as a result of use with a battery pack that is not
manufactured by CareFusion .
A
B
and Washers
securing the Rear Cover Assembly to the Power Base Module .
and remove from saddle slot .
C
1000SM00015 Issue 8
Battery Pack
26/72
Alaris® Gateway Workstation
Corrective Maintenance
Part Number
1000SP01217
1000SP00605

Advertisement

Table of Contents
loading

Table of Contents