Pole Mounting Kit - Care Fusion Alaris Technical & Service Manual

Gateway workstation
Table of Contents

Advertisement

Pole Mounting Kit

Fitting Procedure
1 . Remove Sealing Cord from the channel . Using an Allen key, remove the fasteners from the pre-fitted square nuts in the extrusion
channel . Using a screwdriver or similar pointed tool, slide the loosened square nuts along the channel to the required position .
B
2 . Insert the two Screws
3 . Tighten the Screws ensuring that the mounting kit remains level .
4 . Repeat the process for the remaining kits .
5 . Cut a length of Sealing Cord to fill the channel between the mounting kit and the end caps .
6 . Carefully press the cord into place .
7 . Repeat the operation for the remaining sections of the channel .
B
Screw (x2)
A
Clamp
C
Spacer
Square Nut (x2)
Item
Description
a
Assembly P/Clamp Docking Station Asena
b
M6 x 100 Soc Hd A2 S/S Cap Scrw
c
Spacer, Mounting Long
Ensure that all clamps
Old design
It is important that the mounting brackets are located exactly as detailed in the Mounting Locations section .
A
A
through the Clamp
and Spacers
A
with the T-Bar handle are updated to the new design .
New design
1000SM00015 Issue 8
C
.
52/72
Alaris® Gateway Workstation
Mounting Options
Part Number
1000SP00169

Advertisement

Table of Contents
loading

Table of Contents