Power-Up Check; Beacon (Where Fitted); Pump Loading/Removal Checks - Care Fusion Alaris Technical & Service Manual

Gateway workstation
Table of Contents

Advertisement

Power-up Check

This test checks that the speaker and the keypad LEDs are operating correctly after power-up .
1 . Observing the front panel keypad, connect the Workstation to the AC Mains supply using an IEC Mains Lead and ensure that the AC
Power Indicator is illuminated .
2 . Switch the Workstation on using the ON/OFF button .
3 . Check that the 'ON' Status indicator is illuminated, the System Fault indicator flashes rapidly and the secondary speaker produces a
beep .
4 . The secondary speaker and System Fault Indicator will buzz and flash once per IEC mains outlet, and once for the Service Board,
followed by a 1 second tone from the primary speaker .
5 . The 'A' Status indicator will flash a few times . .
6 . After 30 seconds, the 'B' Status indicator will flash approximately once every 30 seconds .

Beacon (where fitted)

This test checks that the Beacon is working correctly .
1 . Connect the Workstation to the AC Mains supply using an IEC Mains Lead and ensure that the AC Power Indicator is illuminated .
2 . Observing the end Beacon, switch the Workstation on using the ON/OFF button .
3 . Check that the red LED on the beacon flashes brightly .
4 . Check that the amber LED on the beacon flashes brightly .
5 . No more beacon activity should occur unless a pump is alarming .

Pump Loading/Removal Checks

Connect the Workstation to the AC Mains supply using an IEC Mains Lead and ensure that the AC Power Indicator is illuminated .
Load pump to each tile in turn and check:
• Pump is properly located on its electrical connectors
• Pump is mechanically locked into position
• Pump mains indicator turns on when fully fitted
When removing the pump from the tile check:
• Pump mains indicator turns off
• Check that the red LED on the tile turns off when the pump is removed . If the LED stays on, the Workstation should be serviced by
a qualified service engineer .
1000SM00015 Issue 8
Alaris® Gateway Workstation
11/72
Routine Maintenance

Advertisement

Table of Contents
loading

Table of Contents