Configuration - DPS Telecom NetGuardian BSM User Manual

Table of Contents

Advertisement

6
8. Measure voltage. Connect the black cable onto the ground connector of your Digital Voltage Meter (DVM) and red
cable onto the other connector of your DVM. The voltmeter should read between the values listed on the silk
screen next to the power connector.
9. The power plug can be inserted into the power connector only one way to ensure the correct polarity.
Note: The battery terminal is on the left and the GND terminal is on the right.
10.Verify that the
LED is lit. To confirm that power is correctly connected, the front panel status LED will flash
RED and GREEN, indicating that the firmware is booting up.
4.3

Configuration

To configure the NetGuardian BSM, you'll need a PC with terminal emulator, such as HyperTerminal

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the NetGuardian BSM and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Netguardian bsm-g2D-pk-ngbsm

Table of Contents