Operation 82; Preparation - YILMAZ DC 550 Operator's Manual

Double head mitre saw
Table of Contents

Advertisement

Available languages

Available languages

7. OPERATION

7.1 Preparation

7.1.1
Degrease and dry the machine table. Especially ensure that the holding grips and handles
are clean and dry.
7.1.2
Clean all surfaces of the machine from chip and foreign particles. Use eye glasses for
protection.
7.1.3
This machine can process on products manufactured from rigid plastic and aluminum
materials that don't include iron alloy.
7.1.4
Control whether cutting tools ( FIGURE – 10 NO.24 ) are inserted safely to their places.
7.1.5
Control cutting tools against corrosion, distortion and fractions. If cutting tools are
damaged, change them.
7.1.6
Cutting tool must process on the part after machine is operated and cycled.
7.1.7
Absolutely control the direction of rotattion of the saw.
7.1.8
Do not process the profile before clamping the work piece properly.
7.1.9
Adjust the reducer speed adjustment screw ( FIGURE – 10 NO.74 ) by rotating in the
direction of clockwise until providing the desired progress if the saw group cutting progress is
fast. Make the opposite of the above action if the saw group cutting progress is slow.
7.1.10
According to the type and shape of the material to be cut it can be adjusted by controlling the
clamp speed. ( FIGURE – 10 NO.38 )
Ensure that the pneumatıc clamps are outsıde the cuttıng range of the saw blade after adjustıng
the desıred angle ( FIGURE – 13 ).
FIGURE – 13
82

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dc 550 mDc 550 pbDc 550 skDc 550 skh

Table of Contents