Installation Of The Machine; Preparation; Connecting To Power Source - YILMAZ DC 550 Operator's Manual

Double head mitre saw
Table of Contents

Advertisement

Available languages

Available languages

5. INSTALLATION OF THE MACHINE

5.1 Preparation

5.1.6
The machine size and weight measurements, given the technical specification sheet. The
ground, where the machine will be placed, should be even, solid enough to bear the weight
of the machine.
5.1.7
The machine should be located approx. 100 cm away from the rear wall. On the backside of
the machine you will find connection tube for the collection of burr and swarf, hydro-
pneumatic system, cable channels, power supply connection plug.
5.1.8
You can provide the balance of the machine with adjustable counterforts in the bottom part.
5.1.9
The control board ( FIGURE – 8 NO.269 ) is delivered disassembly not to be damaged
during the transfer. Install the panel as shown in the figure. Remove the piece attached to the
panel actuating spindle in order to place the panel to its location. Replace the piece that you
have removed after carefully inserting the panel pulleys onto the spindle.
5.1.10
Fasten material supply conveyor given as Standard accesory onto the cutting unit to the right
side surface of the machine as seen in the FIGURE – 3 by using the screws on the machine.
Provide the conveyor bobbins and machine top surface to be the same parallelism by using a
sensitive and calibrated water gauge.
5.1.11
To use shaving manifolde, the absorbtion flowrate of air for dry chips has to be thought
min.20m/sec. 28 m/sec absobtion flowrate of air wet chips (>=%18 humidity) can be decided
to operate the manifolde.

5.2 Connecting to Power Source

5.2.1
Electrical connection must be made by a licensed electrician
5.2.2
The power outlet socket on the machine should be available.
5.2.3
Plug the machine to a grounded socket.
5.2.4
Mains voltage of the machine is optional as 400 V 50 Hz.
5.2.5
Check the supply voltage. The source voltage must be in accordance with the data on
the machine's label.
5.2.6
After electrical connection is made, machine must be operated in idle running and it must be
controlled whether rotation directions of cutting tools are correct or not and if the rotation
direction is wrong, appropriate connection must be made.
80

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dc 550 mDc 550 pbDc 550 skDc 550 skh

Table of Contents