Installation Of The Machine; Preparation; Connecting To Power Source - YILMAZ KD 402 Manual

Table of Contents

Advertisement

Available languages

Available languages

5. INSTALLATION OF THE MACHINE

5.1 Preparation

5.1.1 The machine size and weight measurements, given the technical specification sheet.The ground, where the
machine will be placed, should be even, solid enough to bear the weight of the machine.
5.1.2 The machine should be located approx. 100 cm away from the rear wall. On the backside of the machine you
will find connection tube for the collection of burr and swarf, hydro-pneumatic system, cable channels, power
supply connection plug.
5.1.3 You can provide the balance of the machine with adjustable counterforts (FIGURE 3 NO 129-1) in the bottom
part.
5.1.4 Circular saw cutting machine designed for double-sided cutting of PVC and aluminum profiles to the desired
measure in straight or angled cutting operations.
5.1.5 Remove the carriage safety parts (FIGURE 4 NO.90/91).

5.2 Connecting to Power Source

5.2.1 Electrical connection must be made by a licensed electrician
5.2.2
The power outlet socket on the machine should be available.
5.2.3 Plug the machine to a grounded socket.
5.2.4 Mains voltage of the machine is optional as 230 V 50 Hz or 400 V 50 Hz.
5.2.5
5.2.6
After electrical connection is made, machine must be operated in idle running and it must be controlled
whether rotation directions of cutting tools are correct or not and if the rotation direction is wrong, appropriate
connection must be made.
Check the supply voltage. The source voltage must be in accordance with the data
on the machine's label.
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents