Connections - Wexiodisk WD-6 DUPLUS Installation And User Manual

Table of Contents

Advertisement

Installation

3.5 Connections

5
A
8
4
1
2 6
3
7
A= Steam hood with extractor (option)
B= Condensation unit with heat recovery through the heat recovery unit
(option)
1.
Electrical connection
2.
Water connection
3.
Drain/waste pipe connection
4.
Plugged hole for detergent hose
5.
Ventilation connection (on machines with steam hood) (option)
6.
Water pressure outlet for detergent dosage
7.
Alternative water connection from below
8.
Bleed for lifting cylinder (on machines with an automatic hood) (option)
9.
Drain connection (option)
In the following chapter, figures are given in brackets to clarify what needs to be
done. These numbers refer to image and list above.
WD-6 DUPLUS
B
min.20
1
2
3
6
(301860_R3)
6D_ansl_R2
12
Rev. 4.0 (202202)
9
3
1
2
6

Advertisement

Table of Contents
loading

Table of Contents