3
|
Components
To install the main PCB
Service manual
294
Prerequisite: Turn OFF the respective circuit breaker.
1 Remove the required plate work, see
a
Cable clamp
2 Unlatch the cable clamp at the top right corner of the main PCB to facilitate
the removal of the PCB.
c
a
c
a
a
c
a
Connector
b
Wire terminal
c
PCB support
3 Disconnect all connectors from the main PCB assembly.
4 Note the field wiring on X1M transmission field wiring terminals.
5 Disconnect wiring connections on wiring terminals.
6 Carefully pull the PCB at the side and unlatch the PCB supports one by one
using a small pair of pliers.
7 Remove the main PCB.
8 To install the new outdoor unit main PCB, see
4
procedures" [
293].
1 Install the main PCB on its correct location.
2 Latch the PCB supports to fix the PCB.
"3.15 Plate
a
c
a
a
c
b
4
work" [
315].
a
c
a
a
c
a
c
"3.11.2 Repair
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
Need help?
Do you have a question about the VRV IV+ and is the answer not in the manual?