Commissioning; Installation And Connection; Procedure - Miele PG 8583 CD Operating Instructions Manual

Laboratory glassware washer
Hide thumbs Also See for PG 8583 CD:
Table of Contents

Advertisement

Switching on
Select
language
Select
temperature unit

Installation and connection

Before commissioning the machine must be securely installed, and
the water inlet and drain hoses and the mains cable correctly
connected. See "Installation", "Plumbing connections" and "Electrical
connection" and the installation plan supplied.

Procedure

During commissioning a set procedure is followed which must not be
interrupted. The display will automatically guide you through the
process.
All settings, except for selecting plumbing connections, can be
retrospectively altered via the
menus.
The settings made during the commissioning process are only
adopted after a complete program has been run.
If the program is interrupted or if no program is started or the
machine is switched off, the commissioning process must be
carried out again.
Press the  button until the LED on the keypad lights up.
The commissioning process starts with selecting the language. For
Canada select "English (CA)" or "Français (CA)".
Language 
english (GB)
english (USA)
Use the  and  arrow buttons to select the language you want
and touch OK to save.
The menu for selecting the temperature unit will then appear.
Temperature unit
°C
°F
Use the  and  arrow buttons to select the temperature unit you
want and touch OK to save.

Commissioning

Settings 
Additional settings
and
(
25

Advertisement

Table of Contents
loading

Table of Contents