Thermo Scientific iCAP Q Operating Manual page 74

Table of Contents

Advertisement

Operation
Getting Ready
6-12
iCAP Q Operating Manual (P/N 1288090, Revision B)
Afterwards, a second performance report is generated to check
whether performance of the instrument has been recovered and the
instrument is now ready for analysis.
In any case, the real time display shown on the Dashboard page
shows the observed signal intensities during all steps of the
procedure.
Figure 6-5. Dashboard showing signal intensities during startup
If all tests were passed, the newly generated settings are saved and
the Get Ready procedure indicates its successful completion.
If other modes have been selected in the Get Ready procedure, they
will be tested once the STD mode performance report has been
passed successfully.
Thermo Fisher Scientific

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Icap qaIcap qcIcap qs

Table of Contents