Download Print this page

Thermo Scientific iQ Series Instruction Manual page 45

Trace level no-no2-nox analyzer
Hide thumbs Also See for iQ Series:

Advertisement

Zero/Span Schedule
Thermo Scientific
The Zero/Span Schedule is used to program the instrument to perform
fully automated zero and span checks or adjustments.
Home Screen>Calibration>Zero/Span Schedule
Home Screen>Calibration>Zero/Span Schedule>More
The Zero/Span Schedule contains the following information:
Zero/Span Schedule: Toggles zero/span schedule Enabled or Disabled.
Next Time: Allows the user to view and set the initial date and time
(24-hour format) of the zero/span schedule.
Period: Defines the period or interval between zero/span checks or
calibrations. If period = 0, the schedule runs continuously.
Zero Duration: Sets how long zero air is sampled by the instrument.
Span Duration: Sets how long span gas is sampled by the instrument.
Purge Duration: Sets how long the purge period will be at the end of
the schedule.
Total Duration: Read only. Displays the total time duration of all
scheduled events.
Operation
Calibration
42iQTL Instruction Manual
3-19

Advertisement

loading

This manual is also suitable for:

42iqtl