Parts and Tools Required
In addition to the AC Modules, you will need the following:
Enphase Equipment
•
Enphase IQ Envoy communications gateway (ENV-IQ-AM1-240) required to monitor solar
production. For installation information, refer to the Enphase IQ Envoy Installation and
Operations Manual.
•
Enphase Installer Toolkit
Download the Enphase Installer Toolkit mobile app and open it to log in to your
Enlighten account. With this app, you can scan microinverter serial numbers and
connect to the IQ Envoy to track system installation progress. To download, go to
enphase.com/toolkit
•
Enphase Sealing caps (Q-SEAL-10) for any unused drops on the Enphase Q Cable
•
Enphase Terminator (Q-TERM-10) typically two needed per branch circuit
•
Enphase Disconnect Tool (Q-DISC-10)
•
Field Wireable Connectors (male and female: Q-CONN-10M and Q-CONN-10F) (optional)
•
Enphase Q Cable:
Cable Model
Single-phase
Q-25-10-240
Q-25-10-240-A*
Q-25-17-240
Q-25-17-240-A*
Q-25-20-200
Q-25-20-200-A*
Multiphase
Q-25-10-3P-200
Q-25-17-3P-160
Q-25-20-3P-160
Other Items
•
Number 2 and 3 Phillips screwdrivers
•
Wire cutters, voltmeter
•
Torque wrench, sockets, wrenches for mounting hardware
•
Crimp tool PV-CZM-18100, -019100, or -22100 for field wireable connectors
•
Compatible cable clips, including:
Wire management options for Q-Cable attached to module frames
Standard /parallel to frame
Nine Fasteners Inc. NFI-1306
Burndy/Wiley Acme ACC
Heyco Sunrunner-2
Hellermann Tyton MSC2
* Due to variances in module frame thickness, these wire clips may not work for all modules
12
or scan the QR code at right.
Connector
PV Module
Spacing
Orientation
1.3m
Portrait
Landscape (60- and
2.0m
96-cell)
2.3m
Landscape (72-cell)
1.3m
Portrait (all)
Landscape (60- and
2.0m
96-cell)
2.3m
Landscape (72-cell)
© 2021 Enphase Energy Inc. All rights reserved.
IQ Microinverter for ACM Applications
Connector Count per
box
240
240
200
200
160
160
90°/perpendicular to frame
Nine Fasteners Inc. NFI-1306-V90
Burndy/Wiley ACC-F90
January 06, 2021