Parts and tools required

In addition to the microinverters, PV modules, and racking, you will need the following:

Enphase equipment

IQ Gateway: Required to monitor production. IQ Gateway (model ENV-IQ-AM1-240, ENV2-IQ-
AM1-240) communications gateway or IQ Combiner (model X-IQ-AM1-240-B, X-IQ-AM1-
240-2, X2-IQ-AM1-240-4C, X2-IQ-AM1-240-4, X-IQ-AM1-240-4C, X-IQ-AM1-240-4).
Enphase Installer App: Download the Enphase Installer App, open it, and log in to your Enphase Installer
Platform account. Use it later to scan microinverter serial numbers and connect to the IQ Gateway to track
system installation progress. To download, go to
Tie wraps or IQ Cable Clips (Q-CLIP-100).
IQ Sealing Cap (Q-SEAL-10) for any unused drops on the IQ Cable.
IQ Terminator (Q-TERM-10) typically, two are required per branch circuit.
IQ Disconnect Tool (Q-DISC-10).
IQ Field Wireable Connectors (male and female: Q-CONN-10M and Q-CONN-10F).
IQ Cable, as listed in the following table.
Cable model
Q-12-10-240
Q-12-17-240
Q-12-20-200

Other items

AC junction box
Number 2 and 3 screwdrivers
Wire cutters and voltmeter
Torque wrench, sockets, and wrenches for mounting hardware
Power drill or impact driver
15
IQ8MC/IQ8AC/IQ8HC Microinverters Installation and Operation Manual
Connector spacing
1.3 m
2.0 m
2.3 m
© 2023 Enphase Energy Inc. All rights reserved.
enphase.com/toolkit
or scan the QR code at right.
PV module
orientation
Portrait
Landscape (60-cell)
Landscape (72-cell)
Connector count
per box
240
240
200