Parts and tools required

In addition to the microinverters, PV modules, and racking, you will need the following:

Enphase equipment

IQ Gateway: Required to monitor production. IQ Gateway (model ENV-IQ-AM1-240, ENV2-
IQ-AM1-240) communications gateway or IQ Combiner (model X-IQ-AM1-240-B, X-IQ-AM1-
240-2, X2-IQ-AM1-240-4C, X2-IQ-AM1-240-4, X-IQ-AM1-240-4C, X-IQ-AM1-240-4).
Enphase Installer App: Download the Enphase Installer App, open it, and log in to your
Enphase Installer Platform account. Use it later to scan microinverter serial numbers and connect to the IQ
Gateway to track system installation progress. To download, go to
code at right.
Tie wraps or IQ Cable Clips (Q-CLIP-100)
IQ Sealing Cap (Q-SEAL-10) for any unused drops on the IQ Cable.
IQ Terminator (Q-TERM-10) typically two needed per branch circuit.
IQ Disconnect Tool (Q-DISC-10)
IQ Field Wireable Connectors (male and female: Q-CONN-10M and Q-CONN-10F)
IQ Cable:
Cable model
Q-12-10-240
Q-12-17-240
Q-12-20-200

Other items

AC junction box
Number 2 and 3 screwdrivers
Wire cutters, voltmeter
Torque wrench, sockets, and wrenches for mounting hardware
Power drill or impact driver
14
IQ8MC, IQ8AC, IQ8HC, and IQ8X Microinverters Installation and Operation Manual
Connector spacing
1.3 m
2.0 m
2.3 m
© 2023 Enphase Energy Inc. All rights reserved.
enphase.com/toolkit
PV module orientation
Portrait
Landscape (60-cell)
Landscape (72-cell)
or scan the QR
Connector count per box
240
240
200
November 2023
USM-00008-2.0