Parts And Tools Required; Enphase Equipment; Other Items - enphase Q 7 Micro Installation And Operation Manual

Microinverters
Table of Contents

Advertisement

Parts and Tools Required

In addition to the microinverters, PV modules, and racking, you will need the following:

Enphase Equipment

Enphase IQ Envoy gateway (ENV-IQ-AM1-240) required to monitor solar production. For
installation information, refer to the Enphase IQ Envoy Installation and Operations Manual.
Enphase Installer Toolkit
Download the Enphase Installer Toolkit mobile app and open it to log in to your
Enlighten account. With this app, you can scan microinverter serial numbers and
connect to the IQ Envoy to track system installation progress. To download, go to
enphase.com/toolkit
Tie wraps or Q Cable Clips (Q-CLIP-100)
Enphase Sealing caps (Q-SEAL-10) for any unused drops on the Enphase Q Cable
Enphase Terminator (Q-TERM-10) typically two needed per branch circuit
Enphase Disconnect Tool (Q-DISC-10)
Field Wireable Connectors (male and female: Q-CONN-10M and Q-CONN-10F)
Enphase Q Cable:
Cable Model
Q-12-10-240
Q-12-17-240
Q-12-20-200

Other Items

Number 2 and 3 screwdrivers
Wire cutters, voltmeter
Torque wrench, sockets, wrenches for mounting hardware
13
or scan the QR code at right.
Connector Spacing
1.3m
Portrait
2.0m
Landscape (60-cell)
2.3m
Landscape (72-cell)
© 2018 Enphase Energy Inc. All rights reserved.
IQ 7 / IQ 7+ / IQ 7X Micro Installation and Operation
PV Module
Connector Count per
Orientation
240
240
200
box
141-00043-02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iq 7+ microIq 7x micro

Table of Contents