Step 11: Set Up And Activate Monitoring - enphase IQ 7 Installation And Operation Manual

Microinverters for acm applications
Table of Contents

Advertisement

Step 11: Set Up and Activate Monitoring

Refer to the Enphase IQ Envoy Quick Install Guide to install the IQ Envoy and set up system monitoring
and grid management functions. This guide leads you through the following:
Connecting the Envoy
Detecting devices and scanning the installation map
Connecting to Enlighten
Registering the system
Building the virtual array
NOTE: When the utility requires a profile other than the default EN 50549-1 or
AS/NZS4777.2 you must select an appropriate grid profile for your installation. You can
set the grid profile through Enlighten, during system registration, or through Installer Toolkit at
any time. You must have an Enphase Envoy communications gateway to set or change the
grid profile. For more information on setting or changing the grid profile, refer to the Enphase
IQ Envoy Installation and Operation Manual at enphase.com/support.
22
© 2021 Enphase Energy Inc. All rights reserved.
IQ Microinverter for ACM Applications
January 06, 2021

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents