Parts And Tools Required; Enphase Equipment; Other Items - enphase IQ8P Installation And Operation Manual

Microinverters
Hide thumbs Also See for IQ8P:
Table of Contents

Advertisement

NOTE: Protection against lightning and resulting voltage surges must be in
accordance with local standards.

Parts and tools required

In addition to the microinverters, PV modules, and racking, you will need the following.

Enphase equipment

IQ Gateway: Required to monitor production and configure microinverters to be compliant
with certain AHJs. IQ Gateway models are ENV-S-AM1-230-60 and
ENV-IQ-AM3-3P.
Enphase Installer App: Download the Enphase Installer App, open it, and log in to
your Enphase Account. Use it later to scan microinverter serial numbers and
connect to the IQ Gateway to track system installation progress. To download it, go
to
https:/ /enphase.com/installers/apps
Tie wraps or IQ Cable Clips (Q-CLIP-100)
IQ Sealing Caps (Q-SEAL-10) for any unused drops on the IQ Cable.
IQ Terminator (Q-TERM-10): Typically, two are needed per branch circuit.
IQ Disconnect Tool (Q-DISC-10)
IQ Field Wireable Connectors (male and female: Q-CONN-10M and Q-CONN-10F)
IQ Cable. The following table lists the cable models.
Cable model
Q-12-10-240
Q-12-20-200

Other items

AC junction box
Number 2 and 3 screwdrivers
Wire cutters, voltmeter
Torque wrench, sockets, wrenches for mounting hardware
Power drill or impact driver
14
Connector spacing
1.3 m
2.3 m
© 2024 Enphase Energy Inc. All rights reserved.
Enphase IQ8P Microinverters
or scan the QR code at the right.
PV module
orientation
Portrait
Landscape (72-cell)
Connector count
per box
240
200
January 2024
IOM-00002-1.0

Advertisement

Table of Contents
loading

Table of Contents