Step 8: Manage the Cabling

A. Use cable clips to attach the cable to the module frame. Leave no more than 1.8 m (six feet)
between cable clips.
B. Dress any excess cabling in loops so that it does not contact the roof. Do not form loops smaller
than 12 cm (4¾ ") in diameter.
WARNING: Tripping Hazard. Loose cables can become a tripping hazard. Dress the
Enphase Q Cable to minimize this potential.
NOTE: Some modules do not include framing on their shortest side. Cable clips cannot
attach to the frameless side for cable management. Plan to use the longer, framed side
for cable management when this is the case.