corresponding port, and then the cover should be fixed back and the waterproof cap
should be tightened, as shown in Figure 29.
Step 6:
Connect the PV MC4 connector to the PV ports of the inverter.
AU
DE
Figure 30 Connection of PV cables
Figure 31 Connection of AC cables
32 / 55
On-Grid (L1/L2/L3/N/PE)
Back-Up (L1/L2/L3/N)
On-Grid (L1/L2/L3/N/PE)
Back-Up (L1/L2/L3/N/PE)