In some cases, this screen will also show the location in the tote where to
place the items (Figure 4-24). In this example, 162 items need to be added
to the top left quadrant of the tote.
2. At this point, the PPA will present the operator with a tote for putting the
product into. Fill the amount requested into the tote in the pick station.
You should never restock a tote with items piled higher than the top of
the tote. Overfilling the tote will likely cause over-height jams in the machine.
3. When complete, the operator presses the corresponding PTL button or the
container icon in the WUI (Figure 4-25) and the tote is taken away for
storage in the PPA.
78
Figure 4-24: Run Screen - populated
NOTICE
Perfect Pick® Cortex™ Operator Manual
OPEX Corporation
Operation
Need help?
Do you have a question about the Perfect Pick Cortex and is the answer not in the manual?
Questions and answers