2.6.4. Fully de-energizing AC power
Contact the customer's site supervisor before attempting this procedure. Only
the customer's authorized site maintenance personnel are permitted to shut
off the site AC power.
At most customer sites, the PPIWS is hard-wired to a dedicated AC main
disconnect switch located near the machine. To safely de-energize the PPIWS
AC Distribution enclosure, the incoming power must be shut off by turning off
and locking out the customer's main disconnect switch.
An Authorized Employee or qualified electrician must proceed as follows:
1. Complete all steps under
page
32.
2. Customer's site maintenance personnel only: shut off the main AC
disconnect switch and install a Lockout-Tagout device (Figure 2-10).
Figure 2-10: Example- AC main disconnect with Lockout/Tagout
36
WARNING
"LOTO - Machine Maintenance and Repair" on
Perfect Pick® Cortex™ Operator Manual
OPEX Corporation
Safety