Mitsubishi Electric Q Series Reference Manual page 123

Hide thumbs Also See for Q Series:
Table of Contents

Advertisement

4 SETUP AND PROCEDURES BEFORE STARTING THE OPERATION
CPU
module
CPU
module
4 - 29
2)
When designating a station in other than the redundant system as a
testing station
The settings are the same as those for the usual forward loop/reverse
loop test (see (1) (a) of this section).
Set "Online" to the redundant system modes of both systems A and B.
(2) Starting the test
Perform the following on the other station first, and then the station executing the
test.
(a)
High Performance model QCPU, Process CPU, and Redundant CPU
Set the RUN/STOP switch to STOP, and reset with the RESET/L.CLR
switch.
Center
3
4
5
STOP
RUN
RESET L.CLR
(b)
Basic model QCPU, Universal model QCPU, and Safety CPU
Reset with the RESET/STOP/RUN switch.
Hold the switch in the RESET position until the ERR LED starts flashing,
and release it after the LED turns off.
STOP
RESET
RUN
STOP
POINT
To execute the forward loop/reverse loop test, connect the cable correctly to OUT
and IN. Also, do not connect or disconnect the cable during execution of the test.
(Doing so will result in test failure.)
<Settings for system A>
Set "Online" for the mode of both systems A and B.
RESET
3
4
5
STOP
RUN
RESET L.CLR
Move to RESET.
RESET
RUN
STOP
MELSEC-Q
<Settings for system B>
Center
3
4
5
STOP
RUN
RESET L.CLR
The ERR. LED flickers.
When it goes off, release
the switch.
RESET
RUN
STOP
4 - 29

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents