Mitsubishi Electric Q Series Reference Manual page 115

Hide thumbs Also See for Q Series:
Table of Contents

Advertisement

4 SETUP AND PROCEDURES BEFORE STARTING THE OPERATION
Insert the plug by aligning the groove of
the plug with the projection of the jack.
Rotate the plug in the direction of the
arrow (clockwise) securely to the position
shown in the second figure from above.
Rotate the plug in the direction of the
arrow and unhook it.
Hold the plug by hand and pull it out in
the direction of the arrow as shown in
the bottom diagram.
4 - 21
(b)
Installing the coaxial cable
The following shows how to install the coaxial cable:
Start (Installation)
Turn OFF the power.
Complete
(c)
Removing the coaxial cable
The following shows how to remove the coaxial cable:
Start (Removal)
Turn OFF the power.
Complete
Jack
Plug
Groove
Plug
MELSEC-Q
Network module
Projection
Network module
4 - 21

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents