Required Facility Needs; Privacy And Security - GE LOGIQ S8 Service Manual

Hide thumbs Also See for LOGIQ S8:
Table of Contents

Advertisement

GE H
EALTHCARE
D
5394227, 12
IRECTION
2-3-2

Required Facility Needs

NOTE:
GE Healthcare requires a dedicated power and ground for the proper operation of its Ultrasound
system. This dedicated power shall originate at the last distribution panel before the system.
Sites with a mains power system with defined Neutral and Live:
The dedicated line shall consist of one phase, a neutral (not shared with any other circuit), and a full
size ground wire from the distribution panel to the Ultrasound outlet.
Sites with a mains power system without a defined Neutral:
The dedicated line shall consist of one phase (two lines), not shared with any other circuit, and a full
size ground wire from the distribution panel to the Ultrasound outlet.
The following are mandatory site requirements. Additional (optional) recommendations, as well as a
recommended ultrasound room layout, are provided in
Dedicated single branch power outlet of adequate amperage (see
Specifications on page
(8.2 ft.) from the LOGIQ S8 proposed location.
Door opening of at least 76 cm (2.5 ft.) in width.
Proposed location for the LOGIQ S8 is at least 0.2 m (0.67 ft.) from the walls, to enable cooling.
Power outlet and place for any external peripheral are within 2 m (6.5 ft.) of each other with
peripheral within 1 m of the unit to connect cables.
Power outlets for other medical equipment.
Clean and protected space for storage of probes (either in their case or on a rack).
Material to safely clean probes (performed using a plastic container, never metal).
NOTE:
The LOGIQ S8 has one outlet for on board peripherals.
In case of network option:
An active network outlet in the vicinity of the ultrasound unit.
A network cable of appropriate length (regular Pin-to-Pin network cable).
An IT administrator who will assist in configuring the unit to work with your local network.
A fixed IP address is required. Refer to the form provided in
Network Information on page 3-96
NOTE:
All relevant preliminary network port installations at the prepared site must be performed by
authorized contractors. The purchaser of GE equipment must utilize only qualified personnel to
perform servicing of the equipment.
2-3-3

Privacy and Security

Since the LOGIQ systems are integrated into your IT-network, GE wants to make sure that you are
aware of the proactive measures we are taking to secure the system.
For more information on privacy and security, refer to LOGIQ S8 Privacy and Security manual in eDoc
CD.
2 - 8
2-3) that meets all local and national codes and is located less than 2.5 m
for network details that are required.
Section 2-3 - Facility needs
LOGIQ S8/LOGIQ E8 S
Section 2-3-4 "Desirable features"
Table 2-2 Electrical
Figure 3-61 Worksheet for DICOM
M
ERVICE
ANUAL
.

Advertisement

Table of Contents
loading

Table of Contents