GE LOGIQ S8 Service Manual page 190

Hide thumbs Also See for LOGIQ S8:
Table of Contents

Advertisement

GE H
EALTHCARE
D
5394227, 12
IRECTION
4-3-8-1
Before moving the system (cont'd)
1.) Adjust the monitor and control panel using Up/Down control and Swivel control to their centered and
lowest positions. Refer to
operator panel from side to
2.) Flip down the monitor and lock the monitor arm.
3.) Turn the system off, including the circuit breaker (see
and remove the plug from the wall.
4.) All cables from off-board peripheral devices must be disconnected from the console.
5.) Disconnect the footswitch from the console.
6.) Wind the power cable around the cable hook.
NOTE:
To prevent damage to the Power Cord, DO NOT pull excessively on the cord or make sharp
bends while wrapping.
7.) Connect all probes to be used while off site. Ensure that probe cables are out of the way from the
wheels and not protruding beyond the console. Use the probe management hooks located below
the Operator Panel to further secure the probe cables.
8.) Store all other probes in their original cases or in soft cloth or foam to prevent damage.
9.) Put the coupling gel in the gel holder.
10.)Ensure that no loose items are left on the console and unlock the wheels.
4 - 14
PROPRIETARY TO GE
4-3-6-1 To raise/lower the operator panel
side.
Figure 4-11 Flip down the monitor and lock the monitor arm
Figure 4-12 Moving/Transporting position
Section 4-3 - General procedures
LOGIQ S8/LOGIQ E8 S
and
4-3-6-2 To move the
Section 3-7 "Power On/Off" on page
M
ERVICE
ANUAL
3-17),

Advertisement

Table of Contents
loading

Table of Contents