Outlet Test - Wiring Arrangement - GE Venue 50 Basic Service Manual

Hide thumbs Also See for Venue 50:
Table of Contents

Advertisement

Care and Maintenance

Outlet test - wiring arrangement

NOTE:
10-24
Test all outlets in the area for proper grounding and wiring
arrangement by plugging in the neon outlet tester and noting the
combination of lights that are illuminated. Any problems found
should be reported to the hospital immediately and the
receptacle should not be used.
CORRECT WIRING
REVERSED POLARITY
HOT AND GROUND
REVERSED
Figure 10-2. Typical alternate outlet tester
No outlet tester can detect the condition where the Neutral
(grounded supply) conductor and the Grounding (protective
earth) conductor are reversed. If later tests indicate high leakage
currents, this should be suspected as a possible cause and the
outlet wiring should be visually inspected.
OPEN GROUND WIRE
OPEN NEUTRAL WIRE
OPEN HOT WIRE
Venue 50 – Basic Service Manual
5447566-100 English Rev. 7

Advertisement

Table of Contents
loading

This manual is also suitable for:

5452256544862355608515561656

Table of Contents