GE Venue 50 Basic Service Manual page 286

Hide thumbs Also See for Venue 50:
Table of Contents

Advertisement

environmental specifications for the unit, 2-4
errors, i-12
ESD, 1-26
ESD prevention, 1-27
F
facility needs, 2-11
desirable features, 2-13
DICOM network function, 2-16
DICOM setup requirements, 2-17
minimal floor plan suggestion, 2-14
network setup requirements, 2-16
purchaser responsibilities, 2-12
recommended floor plan suggestion, 2-14
required facility needs, 2-13
suggested floor plan
scanner and EchoPAC in same room,
2-14, 2-15
floor plan suggestion
mininal, 2-14
recommended, 2-14
scanner and EchoPAC in same room, 2-14,
2-15
functional checks, 10-12
mains cable inspection, 10-13
system checks, 10-12
G
GE Healthcare leakage current limits, 10-22
general console requirements, 2-3
generic procedure on probe leakage current, 10-30
grounding continuity, 10-25
H
hardware/software compatibility, 9-4
hardware-software
compatibility, 5-3
hot or cold
if the unit is very cold or hot, 2-3
how often should maintenance tasks be performed?,
10-5
human safety, 1-16
I
icons, 1-6
icons indicating a special procedure to be used, 1-9
if the unit is very cold or hot, 2-3
important precautions, i-2
installation
see "system setup", 3-1
installation warnings
see "setup warnings", 3-3
introduction (chapter 1), 1-1
Index-2
L
legal notes, i-14
lighting, 2-5
list of abbrevations, 9-3
loading software, 8-13
lockout/tagout (LOTO) requirements, 1-24
LOTO
lockout/tagout requirements, 1-24
M
mains cable inspection, 10-13
maintenance
physical inspection, 10-14
preliminary checks, 10-11
system maintenance, 10-11
maintenance task schedule, 10-5
manufacturer, 1-29
mechanical safety, 1-18
model designations, 1-6
models covered by this manual, 1-5
Monitor Display, 4-10
N
network setup requirements, 2-16
No Probe, 3-43
O
omission and errors, i-12
operational and storage temperature for probes, 2-10
P
paperwork
after setup, 3-56
periodic maintenance inspection (PM), PM (periodic
maintenance inspection), 10-2
phone numbers
customer assistance, 1-29
physical dimensions, 3-29
physical inspection
at arrivel, 3-22
Power On, 3-28
precautions
certified electrical contractor statement, i-11
damage in transport, i-11
important precautions, i-2
service safety considerations, i-13
translation policy, i-2
prepeare for setup, 3-22
probe cleaning, 10-16
probe leakage current test, 10-29
probe maintenance, 10-15
basic probe care, 10-15
basic probe cleaning, 10-16
probe related checks, 10-15
Venue 50 – Basic Service Manual
5447566-100 English Rev. 7

Advertisement

Table of Contents
loading

This manual is also suitable for:

5452256544862355608515561656

Table of Contents