GE Venue 50 Basic Service Manual page 119

Hide thumbs Also See for Venue 50:
Table of Contents

Advertisement

Mounting Procedure (continued)
NOTE:
Venue 50 – Basic Service Manual
5447566-100 English Rev. 7
6. Install the Power Module to the Tray Assy vertically and
ensure both ribs are located in the slots.
After installed successfully, the lock button should be at the
lock position. If the lock button moves to the unlock position
while the Venue 50 is in use, the Power Module needs to
be re-mounted
Table 3-13:
Label/Icon
System Configuration
Label/Icon Explanations
Explanations
If the lock button is at the left side, it means
it is at the lock position.
If the lock button is at the right side, it
means it is at the unlock position.
3-47

Advertisement

Table of Contents
loading

This manual is also suitable for:

5452256544862355608515561656

Table of Contents