Maintenance; Inspection - ProMinent Hydro/ 4 Assembly And Operating Instructions Manual

Metering pump
Table of Contents

Advertisement

7

Maintenance

Before all maintenance work

7.1 Inspection

Regular inspection – at least 1x a month
User qualification: trained and qualified personnel,
unless otherwise stated
Ä Chapter 2.2 'User qualification' on page 15
WARNING!
Danger from hazardous substances!
Possible consequence: Fatal or very serious injuries.
Please ensure when handling hazardous substances
that you have read the latest safety data sheets provided
by the manufacture of the hazardous substance. The
actions required are described in the safety data sheet.
Check the safety data sheet regularly and replace, if
necessary, as the hazard potential of a substance can
be re-evaluated at any time based on new findings.
The system operator is responsible for ensuring that
these safety data sheets are available and that they are
kept up to date, as well as for producing an associated
hazard assessment for the workstations affected.
1.
Disconnect the pump electrically.
2.
Disconnect the pump hydraulically.
3.
Use a suitable medium to rinse the pump.
Check the pump installation for:
Leaks,
n
Abnormal noises or squeaks,
n
Unusual temperatures,
n
Unusual odours,
n
Unusual vibrations,
n
Other anomalies,
n
Correct oil level.
n
Maintenance
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ha4a

Table of Contents