Fill And Install The Dewar - Micromeritics GEMINI VII 2390 Installation Instructions And Checklist

Surface area analyzer
Hide thumbs Also See for GEMINI VII 2390:
Table of Contents

Advertisement

F
I
ILL AND
NSTALL THE
Dewar Precautions on the previous page
1. Fill the Dewar with the analysis bath liquid (such as liquid nitrogen) to no higher than 1 in.
(2.5 cm) from the top for a large Dewar or no higher than 3/4 in. (2 cm) from the top for a
smaller Dewar.
Incorrect fluid levels can lead to measurement errors. Check the level of the bath
liquid before each analysis.
2. Check the level of the analysis bath liquid. For best results, if the Dewar has not been used
for a while, allow approximately 30 minutes for the temperature of the Dewar to stabilize
with the bath liquid, then recheck the level of the bath liquid. Add additional liquid if
necessary.
3. Slide the Dewar cover to approximately 7.5 cm (3 in.) from the sample port nuts to ensure a
proper seal on the top of the Dewar.
4. Place the Dewar on the elevator. A Dewar support is not necessary for the larger Dewar
used with the Gemini 2390t. Place the Dewar directly on the elevator.
5. Close the safety shield on the front of the analyzer.
Gemini VII 2390 Installation Instructions and Checklist
239-42870-02 Rev (B) — May 2021
D
EWAR

Fill and Install the Dewar

7 - 15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GEMINI VII 2390 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Gemini vii 2390aGemini vii 2390pGemini vii 2390t

Table of Contents