9 Installation Checklists
Connect Cables
Procedure
Connect the power cord to the analyzer and power source.
If one Ethernet based analyzer was purchased, connect the
Ethernet cable to the analyzer and the computer, or if more
than one Ethernet based analyzer was purchased, connect an
Ethernet cable from the computer to the Ethernet switch. Then
connect the Ethernet based analyzers to the Ethernet switch.
Degasser Installation
Procedure
Optional Smart VacPrep installed.
9 - 4
Evaluation
Code
Gemini VII 2390 Installation Instructions and Checklist
239-42870-02 Rev (B) — May 2021
Evaluation
Initial / Date
Code
P
F
N/A
P
F
N/A
Initial / Date
P
F
N/A
Need help?
Do you have a question about the GEMINI VII 2390 and is the answer not in the manual?